Our Roadmap

One calendar. The same on every page.

If a date moves, it moves here first and the founders hear about it in writing the same week. We would rather publish a slip than quietly redraw the timeline and hope nobody kept the old one.

Injection mould tooling for the VION dispenser
Q4 2026

The moment a design stops being a drawing: the mould block, and the four dispensing tests that still have to pass.

  1. Q4 2025

    Technology built

    Core technology validated: supplement formulation, software and hardware prototypes ready for real world testing.

  2. Q1 2026

    Pilot with first customers

    First real users testing the full VION experience in daily life, generating data, insights and validation.

  3. Q2 2026

    Product upgraded with pilot feedback

    What the pilot taught us translated into product, software and operational changes.

  4. Q3 2026

    Founder campaign opens

    Reservations and founder places go live. This is where we are today.

  5. Q4 2026

    Industrialisation and tooling

    Transition from prototype to scalable manufacturing: moulds, tooling and the four dispensing tests that are still pending.

  6. 2027

    First production batches

    The first commercial units are manufactured, marking the start of operational readiness.

  7. 2027

    Founders receive their devices

    Tooling done, hardware optimised, first units built and shipped to founders before anyone else.

  8. 2028

    Open to everyone

    VION opens to the US and international markets at the standard price of €330.

  9. 2028

    Growth and expansion

    The company scales across markets, channels and partnerships to accelerate long term adoption.

What is still not done

The four tests that decide whether any of this works.

The industrial design is final and the CAD is resolved part by part. The firmware and these four dispensing tests are not. We publish each result here when it exists, pass or fail.

Pending

0.2 ml at ±5%

Every number on this site rests on this one. The July 2026 run came out at ±7% and is published in the journal. The next one is the number that counts.

Every number on this site rests on this one. The July 2026 run came out at ±7%.

Pending

225 consecutive pulses

A full cartridge, start to finish, without drift in the amount served.

A full cartridge, start to finish, without drift in the amount served.

Pending

No cross-contamination

Six cartridges sharing one pour path. Nothing from one slot may reach another.

Six cartridges sharing one pour path. Nothing from one slot may reach another.

Pending

Pour repeatability

The same instruction has to produce the same shot on day one and on day two hundred.

The same instruction has to produce the same shot on day one and on day two hundred.